Demo clockDark mode

Duroob fleet tracking

RunningData TimeFleet tracking

Live tracking of 240 vehicles with geofences and fuel reports.

fleet.duroob.sa
Open tickets11 ticket near its deadline
In the queue0No owner yet, in the “Mobile & Integrations team” queue
Incoming, 30 days5Each column is a day of the last 14
First reply (median)⁦4⁩h ⁦55⁩mFrom creation to the team’s first reply
Client satisfaction4.0 / 5From 2 ratings

Who receives its tickets

The team is set on the system; the supervisor is the team’s. Figures: their open tickets here out of their whole load.

TicketAny ticket on it
SystemDuroob fleet tracking
TeamMobile & Integrations team
SupervisorHZHaifa Al-Zahrani
  • HZHaifa Al-ZahraniTeam supervisor0of ⁦0⁩
  • OBOmar BawazirMobile developer1of ⁦2⁩
  • DMDana Al-MalkiIntegration & API specialist0of ⁦0⁩

Team’s internal instructions

Shown to staff only while working; never reaches the client.

Edit the instructions

Teltonika FMB920 devices; devices silent over 30 minutes show on the grafana board.

Tickets on this system

Everything its clients raised on it; every one of them reads its team from the system.

⁦1⁩ result
Export CSV
Time left of its priority’s resolve target, or how far past it; the clock pauses while the client is asked for information.Actions
In progressMediumNearing SLA· ⁦3⁩h ⁦41⁩m leftOBOmar BawazirAvailableyesterday
⁦1⁩–⁦1⁩ of ⁦1⁩

System history

Every change to it from the audit log: who, when, the value before and after, and the reason.

20 January 2025

  1. Milestone: Duroob fleet tracking was added to the catalogue

    2025-01-20 09:00

Added to the catalogue 670 days ago.

About the system

Provider company
Data Time
Product line
Fleet tracking
Technology
Go · TimescaleDB · Teltonika
Added to the catalogue
2025-01-20 09:00

No other copies of the product

This system is alone on its product line.

Separate copies of one product can show the same fault, and are then grouped under one parent ticket.