The components Sanad’s three portals — admin, the support desk and the client portal — are built from, live in Arabic and English, light and dark, and in both company identities. What changes here changes on every screen that uses it.
Dark mode
component groups
11
live specimens
110
The two identities
Sanad wears the identity of the company whose domain it was opened from: Data Time or Real Solutions — client portal, support desk and admin alike. An identity is one attribute, «data-brand», on any element, and everything under it takes its colours — the same piece draws in both identities without one extra line.
The two identities side by side
Each column is a wrapper in its identity: the mark and name, a small hero band, the base colours with their token names, two buttons and a badge. Flip light and dark with the switch at the top of the page to see both modes.
Data TimeSystems that run on time, support that arrives on time
Open tickets
14
3 of them near their SLA
Every portal on Data Time’s domain: admin, the support desk and clients, and their messages
Base colours
--brand
--accent
--deep
--canvas
--surface
--sunken
--ink
--ink-3
In progress
Real Solutions
Deep royal blue and indigo, with teal touches
data-brand="rs4it"
Real SolutionsReal technology solutions for real businesses
Real SolutionsReal Solutions · RS4IT
Open tickets
14
3 of them near their SLA
Every portal on Real Solutions’ domain: admin, the support desk and clients, and their messages
Base colours
--brand
--accent
--deep
--canvas
--surface
--sunken
--ink
--ink-3
In progress
Every text-on-ground pair in both identities is measured at 7:1 or better, light and dark. tests/kit/contrast-aaa.test.ts
Both identities run on the Sanad platform — its small mark sits in the footer and on sign-in.
The shared hue scale
Twelve hues, each with a quiet ground («soft»), a text colour («ink») and a solid for dots and bars, never text. Statuses, priorities and SLA timers all name a hue from here, so they read the same in both identities.
--hue-X · --hue-X-soft · --hue-X-ink
Text on its ground
--hue-slate
Text on its ground
--hue-blue
Text on its ground
--hue-indigo
Text on its ground
--hue-violet
Text on its ground
--hue-teal
Text on its ground
--hue-green
Text on its ground
--hue-amber
Text on its ground
--hue-orange
Text on its ground
--hue-red
Text on its ground
--hue-rose
Text on its ground
--hue-cyan
Text on its ground
--hue-sky
The eight organisation tones
Each client organisation gets one of eight tones for its badge, its avatar and its touch in its portal. Chosen when the client is added; it never follows the identity.
The vocabulary all three portals speak: a ticket’s status, its SLA and priority, where it came from and where its notice goes, and who may act. Every piece carries its word with its colour and shape, so nothing is read by colour alone.
Ticket state
What staff see, and what the client sees, about the same ticket.
Ticket status
The support team’s language: the ten statuses with their word and colour. In the inbox, the ticket page and reports. `hint` adds the status’s explanation on hover.
TicketStatusBadge
The ten statuses
Awaiting assignmentAvailable to takeAssignedIn progressAwaiting clientAwaiting internal actionResolvedClosedReopenedCancelled
Both sizes
In progressIn progressAwaiting client
Status as the client sees it
The client portal never shows internal routing states: the ten statuses fold into five, and colour is reserved for what waits on the client. Use it on every screen a client reads.
ClientStatusBadge
Staff seeThe client sees
Awaiting assignmentUnder review
Available to takeUnder review
AssignedUnder review
In progressIn progress
Awaiting clientAwaiting your reply
Awaiting internal actionIn progress
ResolvedAwaiting your confirmation
ClosedClosed
ReopenedIn progress
CancelledClosed
The client’s stations
Four stations: received → in progress → resolved → closed. The current one pulses and says «awaiting your reply» when the ball is in the client’s court. On the portal’s ticket page; `compact` for its cards.
ClientStageTrack
Full, with labels
Under review
1Received
2In progress
3Resolved
4Closed
In progress
Received
2In progress
3Resolved
4Closed
Awaiting your reply
Received
2In progressAwaiting your reply
3Resolved
4Closed
Awaiting your confirmation
Received
In progress
3ResolvedAwaiting your confirmation
4Closed
Closed
Received
In progress
Resolved
Closed
A slim bar for a card
Under review
In progress
Awaiting your reply
Awaiting your confirmation
Time and SLA
The priority sets the target; the timer counts it from the status history.
Priority
Signal bars with the name from master data. Beside every ticket, in the filters and in the impact × urgency matrix.
PriorityBadge
CriticalHighMediumLow
Both sizes
CriticalHighMediumLow
SLA chip
The SLA state with the time left or how late it is. In table cells and cards where the room is one line.
SlaChip
Within SLA· 5h 12m leftNearing SLA· 38m leftSLA breached· 1h 35m lateClock pausedMet the SLAMissed the SLA
Ticks with the demo clock: a ring of the target used, the time left or overdue, and it stops while the ticket waits on the client. In the ticket page’s header; `inline` for a table cell.
SlaTimer · SlaTimer variant="inline"
DTM-2026-0418High
Running — high
31%Within SLA5h 31m leftTarget 8h
Inline
Within SLA· 5h 31m left
RS4-2026-0193Critical
Near — critical
87%Nearing SLA31m leftTarget 4h
Inline
Nearing SLA· 31m left
DTM-2026-0402Medium
Paused — awaiting client
Clock pausedWaiting for the clientTarget 1d · paused 20h 9m
Inline
Clock paused
RS4-2026-0187High
Breached — high
144%SLA breached3h 29m lateTarget 8h
Inline
SLA breached· 3h 29m late
Ticket number
The client’s number in a fixed-width face, isolated left-to-right so it never flips inside an Arabic sentence. `strong` where it heads the row.
TicketNumber
DTM-2026-0412RS4-2026-0187DTM-P-0007
Your ticket DTM-2026-0412 has reached the web team.
Channels and messages
Where the ticket came from, where the notice goes, and what happened to the message.
Source and channel
Where a ticket or message came from, and the client’s notification channel: a WhatsApp group with its member count, a direct number, or email. A broken channel is red and stops sends until it is fixed.
WhatsApp ticks with the word, in the message log and under every reply sent. `iconOnly` for tight places, the word in the tooltip.
DeliveryState
With the word
QueuedSentDeliveredReadFailedSkipped
Tick only
QueuedSentDeliveredReadFailedSkipped
Never sent — no ticks, the skip reason in the tooltip
SkippedSkipped — WhatsApp is off for this clientSkippedSkipped — WhatsApp is not configured on the serverSkippedSkipped — the client turned this kind offSkippedSkipped — email is not enabled in the demoSkippedSkipped — no number to send toSkipped — WhatsApp is off for this client
WhatsApp message preview
How the message looks on the client’s phone: in the template editor, and in «what the client receives» before sending. Variables are filled with their values; an empty one stays visible so it is caught before sending.
WhatsAppMessagePreview
Variables filled
DData Time SupportVerified business account
Ticket reply
New reply on your ticket DTM-2026-0412:
We updated the payment gateway settings and restarted the service. Please try a payment now and let us know.
10:41
A variable left empty
DData Time SupportVerified business account
Resolution done
Your ticket DTM-2026-0398 is resolved. Action: Renewed the Fatoora integration certificate. Confirm the closing on the portal: {{3}}
09:12
A change and where it came from
In the ticket log and the audit log: the old value struck through, then the new one in the reading direction, and how the act arrived — in the app, over MCP with the key’s name, over WhatsApp, or automatically.
FromToDiff · ViaBadge
From → to
In progress→Awaiting clientMedium→HighLama Al-Ghamdi→Sultan Al-MutairiAwaiting assignment
How it arrived
In the appOver MCP· claude-desktop-faisalOver WhatsAppAutomatically
People and catalogue
Who works the ticket, whose it is, and on which system.
Staff and client
A staff member by initials with an availability ring (available, busy, away, off duty); a client organisation by its initials in its tone of eight. ⚠️ The client portal never shows staff names or teams.
A provider company in its OWN identity wherever it appears, a system marked «stopped» when it stops, a team with its distribution mode. In tables, page headers and filters.
CompanyChip · SystemChip · TeamChip
The two companies
Data TimeReal SolutionsData TimeReal Solutions
Systems
Al-Rashed online storeAl-Ufuq parents appAl-Rashed online store
Teams
Web & Portals teamSelf-takeEnterprise Systems teamSupervisor assignsEnterprise Systems teamWithout the mode
Decisions and permissions
How the priority is suggested, who may act, and what happens next.
Impact × urgency matrix
Impact in rows, urgency in columns, each cell its suggested priority and response time. Pick a cell: the raise-a-ticket screen and the master-data tester use it.
ImpactUrgencyMatrix
Impact ↓ · Urgency →
Normal
Can wait; work goes on.
High
Disrupts part of the work.
Urgent
Work has stopped.
Wide
The whole organisation or its customers.
Moderate
A whole department or a branch.
Limited
One user or a few.
Suggested priority:High
A refused action
A control you may not use is shown DISABLED with the reason and the name of who holds the permission — never hidden. Tooltip by default; `inline` writes the reason under it.
PermissionGate
Allowed
Refused — reason in the tooltip
Only the team supervisor can do this: Faisal Al-Otaibi.
Refused — reason written out
The ticket is assigned to Lama Al-Ghamdi; replies and status changes are for its owner or the team supervisor.
What happens on confirm
Rule 14: a confirm says what will happen and to whom, line by line — tickets affected, who is notified, what is recomputed.
EffectList
6 open tickets on «Mawid — Basma Dental» will be attached to the parent ticket, and their separate replies stop.
An update reaches 3 clients through their channels: two WhatsApp groups and a direct number.
Each attached ticket’s SLA is recomputed from its status history; its creation date does not change.
The team supervisor and the two staff who own the tickets are told.
Page frame
Every screen starts here: a header with breadcrumbs, title and purpose, or a deep hero band for dashboards — then sections and panels as quiet layers instead of white cards scattered on white.
Page header
Title, purpose and breadcrumbs come from the route map automatically, with actions, the «working on» chip and an optional row of figures.
PageHeader
Ticket inbox
The daily operating screen: tabs, filters and bulk actions.
For the desk and admin dashboards: the identity’s deep colour with a glow, a quiet dot field, the signal arcs and a lit hairline, with glass figure tiles and a change coloured by whether it is good or bad news. Only the key figure wears the accent.
PageHeader variant="hero"
Support desk · Web & Portals team
Good morning, Faisal
Seven tickets are nearing their SLA; the closest, «Mada payments fail on the Al-Rashed store», has 38 minutes left.
A section is a heading, a purpose and actions; a panel is the surface for a chart, list or table, with `flush` for an edge-to-edge table and `deep` for an important alert.
Section · Panel
Inbox by team
Tickets open right now, ordered by risk
Closest to their SLA
Within the next two hours
DTM-2026-0418In progressNearing SLA· 38m left
RS4-2026-0193AssignedNearing SLA· 1h 4m left
DTM-2026-0407ReopenedNearing SLA· 1h 37m left
Updated two minutes ago
A client channel is broken
The system number was removed from the «Basma Dental» WhatsApp group; four notices did not arrive. Fix the channel, then resend.
A panel with no inner padding
Tabs as links
Each tab is its own address and the open one follows the URL — for the sections of a ticket or client page. `onDeep` on a hero band.
PageTabs
The signal arcs
The identity’s motif: arcs spreading from a point — a support that listens. Drawn in the current text colour at a whisper behind a hero band, at the foot of the side rail, or in an empty state.
BrandMotif
On a deep surface
On a light surface
Logs and boards
What is read in sequence and what is moved by hand: the ticket log says who did what and when, and the ticket board moves a ticket between its statuses by drag or by keyboard.
Ticket log
Who did what to which ticket, newest first and grouped by day, with relative time («3 hours ago») and a status change «from → to» with its badges. `compact` for a side panel on the ticket page.
Comments, approvals and status changes show up here as they happen.
Ticket board
Tickets in their status columns: drag a card to another column, or pick one up with Space and move it with the arrows. A column over its limit turns amber and says so.
KanbanBoard
Try it: drag a card into «In progress», or focus a card, press Space, then the arrows.
Available to take4 · 4 cards
DTM-2026-0417
Invoices rejected by the ZATCA platform
CriticalFatoora — Al-Rashed Group
Within SLA· 5h 12m leftWhatsApp
DTM-2026-0408
Mada and Apple Pay payments failing
CriticalAl-Rashed online store
Nearing SLA· 1h 4m leftWhatsApp
RS4-2026-0381
Invoice QR code won’t scan
MediumFatoora — Al-Jazira Plastics
Within SLA· 5h 12m leftWhatsApp
DTM-2026-0372
Store stock doesn’t match the warehouse
MediumSufrat Al-Deera ordering
Nearing SLA· 1h 4m leftWhatsApp
Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.
Assigned2 · 2 cards
DTM-2026-0411
Appointment reminder SMS not reaching patients
HighMawid — Al-Nukhba Hospital
Within SLA· 21h leftEmail
Owner: Sultan Al-Mutairi
DTM-2026-0375
Same slot booked twice
HighMawid — Sufrat reservations
Within SLA· 21h leftEmail
Owner: Sultan Al-Mutairi
Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.
In progress6 · 6 cards
6 of 5Over the WIP limit
DTM-2026-0420
Main website down with a 502 error
CriticalDuroob hosting
Nearing SLA· 38m leftPortal
Owner: Turki Al-Anazi
DTM-2026-0405
Live Zoom session link won’t open
HighAl-Ufuq learning platform
Within SLA· 1d 16h leftSupport team
Owner: Khalid Al-Subaie
DTM-2026-0399
Nafath sign-in not working
CriticalAl-Nukhba patient portal
Within SLA· 5h 12m leftWhatsApp
Owner: Lama Al-Ghamdi
RS4-2026-0396
WhatsApp messages not showing on customer records
HighCRM — Tamkeen
SLA breached· 1h 35m latePortal
Owner: Yousef Al-Shammari
DTM-2026-0393
Most trucks’ GPS trackers offline
CriticalDuroob fleet tracking
Within SLA· 21h leftEmail
Owner: Dana Al-Malki
RS4-2026-0384
System very slow in the mornings
MediumAl-Jazira Plastics hosting
Nearing SLA· 38m leftPortal
Owner: Turki Al-Anazi
Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.
Awaiting client3 · 3 cards
DTM-2026-0414
November payroll run fails
CriticalHR & payroll — Duroob
Clock pausedPortal
Owner: Yousef Al-Shammari
DTM-2026-0387
Month-end close is blocked
CriticalMawared — Al-Rashed Group
Clock pausedSupport team
Owner: Yousef Al-Shammari
DTM-2026-0378
WPS file rejected by Mudad
HighHR & payroll — Duroob
Clock pausedPortal
Owner: Yousef Al-Shammari
Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.
Resolved1 · 1 card
DTM-2026-0402
Login OTP not arriving
CriticalAl-Nukhba app
Met the SLAPortal
Owner: Omar Bawazir
Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.
Ticket card
The number and title (two lines at most), priority and system as tags, the SLA and source in the footer, the owner at the end. Any card works: `renderCard` takes what you give it.
KanbanCard
Cards in different states
DTM-2026-0420
Main website down with a 502 error
CriticalDuroob hosting
Nearing SLA· 38m leftPortal
Owner: Turki Al-Anazi
DTM-2026-0414
November payroll run fails
CriticalHR & payroll — Duroob
Clock pausedPortal
Owner: Yousef Al-Shammari
DTM-2026-0399
Nafath sign-in not working
CriticalAl-Nukhba patient portal
Within SLA· 5h 12m leftWhatsApp
Owner: Lama Al-Ghamdi
A card with a title only — no number, no owner
Charts
Sanad’s charts: drawn in SVG with no chart library, on fixed-order colour slots, thin marks, a quiet grid, a floating tooltip and a «Show as table» button that shows the same numbers as a real table. Time runs from the right in Arabic; digits are always Latin.
Chart frame and its states
Title, subtitle, legend and actions, and the «Show as table» button. Every chart has a loading state and a quiet empty state at its own height so the card never jumps.
ChartFrame · ChartLegend · ChartTooltip · TipCard
Tickets created vs resolved
Ready — try «Show as table»
Created
Resolved
Tickets created vs resolved
Loading
Tickets created vs resolved
No tickets in this period
No data to show yet
It appears here once the first value is recorded.
Area and line over time
One to four series over time, with a «today» marker and a labelled target line. The admin dashboard compares created with resolved day by day; first-response time reads against its target.
AreaLineChart
Tickets created vs resolved
Last 30 days — both companies
Created
Resolved
5
Median first-response time
In minutes, weekly
Critical & high target · 30 minutes29 minutes
Tickets created vs resolved
Last 30 days
Created
Resolved
5
Columns and bars
Grouped or stacked, upright or horizontal for long Arabic names, with a target tick per category. To compare the two companies, the teams and the clients.
ColumnChart
Open tickets by priority
Per company
Critical
High
Medium
Low
Open tickets by priority
Per company
Critical
High
Medium
Low
Open per team by status
Stacked — long names as rows
In the queue
Being worked
Awaiting client
Resolved this week vs target
Per team
Resolved
Target
Donut and part of a whole
Part-to-whole at a glance (six parts at most), the total in the centre, the legend with value and share. `RingStat` is one value of a whole.
DonutChart · RingStat
Open tickets by status
48
open tickets
In the queue919%
Assigned613%
In progress1633%
Awaiting client1123%
Awaiting internal action48%
Reopened24%
Where tickets come from
Last 30 days
388
tickets
Portal18247%
WhatsApp14136%
Email3810%
Support team277%
93%
Resolved within SLA
93%
of 100%
Of tickets closed this month
92%
Client satisfaction
4.6
of 5.0
Average rating out of 5
41%
Solved on first reply
41%
of 100%
Gauge and nested rings
A share on an arc with its three zones and a tick at the target, the zone’s name written out — never colour alone. Nested rings for several shares together.
Gauge · RadialProgress
92%
On track
Resolution SLA compliance
Target 90%
87%
Watch
Compliance — Real Solutions
The SLA, dimension by dimension
This month
Response within SLA95%
Resolution within SLA92%
Not reopened96%
Solved on first reply41%
Trend spark
A word-sized trend for a table cell or a figure tile: its colour says whether the direction is good — fewer breaches going down is green. The target band is optional.
TrendSpark
Indicator
Latest
Last 8 weeks
Open tickets
48
SLA breached
3
SLA compliance
92%
Client satisfaction
4.6
Reopened
2
With a target band · in the identity colour · flat
Bubble map
The clients at a glance: monthly volume across, SLA breach rate up, bubble area the number of systems, colour the company. Click a bubble to open the client.
BubbleChart
Clients: volume vs SLA breaches
Last 30 days
Data Time
Real Solutions
Systems · 3
Radar
A profile over 3 to 10 axes: the first solid with a light wash, the second dashed as a target. To compare how teams perform.
RadarChart
Team performance
Out of 5 — this month
Web & Portals team
Management target
Enterprise Systems team
Team performance
Infrastructure & Hosting team
Heat map
A grid of rows and columns shaded light to dark in one hue, the figure in the cell and a scale key. When tickets arrive: weekdays × working hours.
A bridge from one figure to another: each change floats from the running total, coloured by whether it is good news — for open tickets, a rise is bad.
Waterfall
Open-ticket bridge this week
From Sunday morning to now
Total
Increase
Decrease
Open on Sunday morningNew ticketsResolvedReopenedCancelledOpen now
Open-ticket bridge this week
From Sunday morning to now
Total
Increase
Decrease
Tables and filters
The ticket register as it works on the support desk: search, filters and saved views, a floating bar for bulk actions, a side sheet that opens the ticket, and a switch between table, cards and board. Then the table’s states: compact and grouped, empty, empty because of filters, loading or failed to load.
Ticket register
The filter bar above the table: saved views, search, filters and their chips, and the table / board switch. Tick rows to raise the floating action bar; click a row to open its sheet.
FilterBar + DataTable + useTableState
Ready-made views
24 results
Display options
Export CSV
Suggested by the impact × urgency matrix when raised; the supervisor confirms it or changes it with a written reason.
Time left on the resolve time promised for the ticket’s priority. The clock pauses while the ticket waits for the client.
Actions
WhatsApp messages not showing on customer records
RS4-2026-0396
TFTamkeen Finance
CRM — Tamkeen
Reopened
High
SLA breached· 1h 35m late
YSYousef Al-ShammariE-invoicing specialist
13 hours ago
Import leads from an exhibition
RS4-2026-0360
MTMasar Travel & Tourism
CRM — Masar
Reopened
Low
SLA breached· 1h 35m late
YSYousef Al-ShammariE-invoicing specialist
yesterday
Main website down with a 502 error
DTM-2026-0420
DLDuroob Logistics
Duroob hosting
In progress
Critical
Nearing SLA· 38m left
TATurki Al-AnaziSystems & hosting engineer
25 minutes ago
System very slow in the mornings
RS4-2026-0384
JPAl-Jazira Plastics Factory
Al-Jazira Plastics hosting
In progress
Medium
Nearing SLA· 38m left
TATurki Al-AnaziSystems & hosting engineer
19 hours ago
Mada and Apple Pay payments failing
DTM-2026-0408
ARAl-Rashed Trading Group
Al-Rashed online store
Awaiting assignment
Critical
Nearing SLA· 1h 4m left
Unassigned
6 hours ago
Store stock doesn’t match the warehouse
DTM-2026-0372
SDSufrat Al-Deera Restaurants
Sufrat Al-Deera ordering
Awaiting assignment
Medium
Nearing SLA· 1h 4m left
Unassigned
yesterday
Invoices rejected by the ZATCA platform
DTM-2026-0417
ARAl-Rashed Trading Group
Fatoora — Al-Rashed Group
Available to take
Critical
Within SLA· 5h 12m left
Unassigned
2 hours ago
Nafath sign-in not working
DTM-2026-0399
NHAl-Nukhba Specialist Hospital
Al-Nukhba patient portal
Awaiting internal action
Critical
Within SLA· 5h 12m left
LGLama Al-GhamdiApplication support specialist
11 hours ago
Invoice QR code won’t scan
RS4-2026-0381
JPAl-Jazira Plastics Factory
Fatoora — Al-Jazira Plastics
Available to take
Medium
Within SLA· 5h 12m left
Unassigned
21 hours ago
Attachment upload fails on the request form
DTM-2026-0363
ACAl-Ahsa Charity Society
Beneficiary portal — Al-Bir
Awaiting internal action
Medium
Within SLA· 5h 12m left
LGLama Al-GhamdiApplication support specialist
yesterday
1–10 of 24Rows per page
Compact and grouped
Compact density for the supervisor’s screens, rows grouped by status with a count per group. Change the grouping from the toolbar.
DataTable defaultDensity='compact' groupings
24 results
Display options
Suggested by the impact × urgency matrix when raised; the supervisor confirms it or changes it with a written reason.
Time left on the resolve time promised for the ticket’s priority. The clock pauses while the ticket waits for the client.
Mada and Apple Pay payments failing
DTM-2026-0408
Critical
Nearing SLA· 1h 4m left
Unassigned
Store stock doesn’t match the warehouse
DTM-2026-0372
Medium
Nearing SLA· 1h 4m left
Unassigned
Invoices rejected by the ZATCA platform
DTM-2026-0417
Critical
Within SLA· 5h 12m left
Unassigned
Invoice QR code won’t scan
RS4-2026-0381
Medium
Within SLA· 5h 12m left
Unassigned
Appointment reminder SMS not reaching patients
DTM-2026-0411
High
Within SLA· 21h left
SMSultan Al-MutairiApplication support specialist
Same slot booked twice
DTM-2026-0375
High
Within SLA· 21h left
SMSultan Al-MutairiApplication support specialist
Main website down with a 502 error
DTM-2026-0420
Critical
Nearing SLA· 38m left
TATurki Al-AnaziSystems & hosting engineer
Live Zoom session link won’t open
DTM-2026-0405
High
Within SLA· 1d 16h left
KSKhalid Al-SubaieSupport developer
Most trucks’ GPS trackers offline
DTM-2026-0393
Critical
Within SLA· 21h left
DMDana Al-MalkiIntegration & API specialist
System very slow in the mornings
RS4-2026-0384
Medium
Nearing SLA· 38m left
TATurki Al-AnaziSystems & hosting engineer
Enrol a new batch of trainees in a course
DTM-2026-0369
Medium
Within SLA· 1d 16h left
KSKhalid Al-SubaieSupport developer
Geofence alerts firing for no reason
DTM-2026-0357
Medium
Within SLA· 21h left
DMDana Al-MalkiIntegration & API specialist
November payroll run fails
DTM-2026-0414
Critical
Clock paused
YSYousef Al-ShammariE-invoicing specialist
Month-end close is blocked
DTM-2026-0387
Critical
Clock paused
YSYousef Al-ShammariE-invoicing specialist
WPS file rejected by Mudad
DTM-2026-0378
High
Clock paused
YSYousef Al-ShammariE-invoicing specialist
Inventory valuation wrong after stock count
RS4-2026-0351
Medium
Clock paused
YSYousef Al-ShammariE-invoicing specialist
Nafath sign-in not working
DTM-2026-0399
Critical
Within SLA· 5h 12m left
LGLama Al-GhamdiApplication support specialist
Attachment upload fails on the request form
DTM-2026-0363
Medium
Within SLA· 5h 12m left
LGLama Al-GhamdiApplication support specialist
WhatsApp messages not showing on customer records
RS4-2026-0396
High
SLA breached· 1h 35m late
YSYousef Al-ShammariE-invoicing specialist
Import leads from an exhibition
RS4-2026-0360
Low
SLA breached· 1h 35m late
YSYousef Al-ShammariE-invoicing specialist
Login OTP not arriving
DTM-2026-0402
Critical
Met the SLA
OBOmar BawazirMobile developer
App crashes on Android 14
RS4-2026-0366
High
Met the SLA
OBOmar BawazirMobile developer
Donation receipts not being sent
DTM-2026-0390
High
Missed the SLA
LGLama Al-GhamdiApplication support specialist
Monthly donation charged twice
DTM-2026-0354
Medium
Met the SLA
LGLama Al-GhamdiApplication support specialist
1–24 of 24
Cards
The same rows as cards, for a narrow screen or a quick review, with the same selection and paging.
No tickets at all: the table says so quietly and suggests the next step.
DataTable rows={[]} empty={…}
Display options
Suggested by the impact × urgency matrix when raised; the supervisor confirms it or changes it with a written reason.
Time left on the resolve time promised for the ticket’s priority. The clock pauses while the ticket waits for the client.
No open tickets
All quiet. New tickets appear here as soon as they arrive from the portal or WhatsApp.
Empty because of filters
The filters match no ticket: the table says the filters are why and offers to clear them.
DataTable filtered onClearFilters
Status: CancelledPriority: Critical
0 results
Display options
Suggested by the impact × urgency matrix when raised; the supervisor confirms it or changes it with a written reason.
No results match the filters
Try another word or loosen the filters to see more.
Loading and error
Skeleton rows while loading, and an error state whose «Try again» goes back to loading, then the rows.
DataTable loading error={{ onRetry }}
Display options
Title
Number
Status
PrioritySuggested by the impact × urgency matrix when raised; the supervisor confirms it or changes it with a written reason.
SLATime left on the resolve time promised for the ticket’s priority. The clock pauses while the ticket waits for the client.
Owner
Foundations
Colour, type and corners, then the smallest pieces every screen is built from: buttons, badges, avatars and hints.
Colours
Every colour on screen is one of these names, never a hand-typed code. Click a colour to copy its name.
tokens · ColorSwatch
Two colours make an identity its own: the brand and the accent, plus the ink. The three are written in ONE block at the top of the stylesheet, and everything shown here is derived from them — light and dark alike. Change that block and every screen changes.
Brand
Accent
Ink steps
Surfaces
Lines
The four status tones
Tone
Soft
Solid
When
Brandbrand
Sample
Sample
The main action, links, selection
Neutralneutral
Sample
Sample
Drafts, secondary actions
Accentaccent
Sample
Sample
What deserves a gentle look
Successsuccess
Sample
Sample
Approved, complete, on time
Warningwarning
Sample
Sample
Close to due, needs a change
Dangerdanger
Sample
Sample
Late, delete, reject
Infoinfo
Sample
Sample
In review, a note
Status tones are fixed: they never follow a rebrand, so red is red in every identity.
Gradient and the deep shade
Signature gradient
For the ONE key action on a screen
bg-signature
Glow
For a page hero or an empty state
bg-glow
Deep shade
The sidebar and tooltips
bg-deep
Type scale
Eight sizes are enough for every screen. Figures are always Latin digits and line up in columns.
text-*
text-4xl36px
This week's report is ready for review
A big figure in a page header
text-3xl30px
This week's report is ready for review
Screen title
text-2xl24px
This week's report is ready for review
Section title
text-lg18px
This week's report is ready for review
Card title
text-[15px]15px
This week's report is ready for review
Lead paragraph
text-sm14px
This week's report is ready for review
Body text
text-xs12px
This week's report is ready for review
A hint under a field
text-2xs11px
This week's report is ready for review
A small label over a group
Corners and shadows
One base corner (10 px) the others derive from, and five shadows for elevation. In dark mode the shadows go deeper.
rounded-* · shadow-*
Corners
sm · 6
md · 8
lg · 10
xl · 14
2xl · 18
full · ∞
Shadows
xs
sm
md
lg
xl
brand
Button
Six shapes, each taking any tone. The signature shape is for the ONE key action of a screen.
Buttons joined in one frame, or a spaced row. The group's size and tone apply to every button in it.
ButtonGroup
Joined
Spaced
Icon button
A square button with only its icon. Its name is required, and shows as a tooltip on hover or focus.
IconButton
Shapes
EditShareSaveDeleteSearchCtrlK
Sizes
SmallMediumLargeUnavailable
Split button
A main action with an arrow beside it that opens the alternatives. The menu floats above everything, is never clipped, and Escape closes it.
SplitButton
Shapes
Other ways to send
States
Copy button
Copies the text and says «Copied» right where it was pressed, for two seconds; a refused clipboard says «Copy failed». Built on the kit's button; the starter's path re-exports it.
A starter pieceCopyButton
With words
https://house.example/invite/7Q2K
Icon only — the word in the tooltip, plus a toast
https://house.example/k/7Q2KCopy link
Badge
A short word for a state: soft, solid or outlined, with a dot or an icon.
Badge
Soft
ApprovedIn reviewLateDraftUrgent
Solid · Outline
ApprovedLateIn reviewUrgent
Sizes
SmallMediumLarge
Tag
A tag that toggles when pressed (for filters), is removed with its button, or carries a person.
Tag · Chip
For filtering
Removable
FinanceHuman resources
People
Sara Al-QahtaniFahad Al-OtaibiPremium Hospitality Co.
Count and status dot
A small number in a bubble that reads «99+» past its limit, and a dot that breathes for what is live now.
Count · StatusDot
Shapes
34299+5977 unread
States
Online nowSyncingOffline
Avatar
Two initials in a colour fixed to the name everywhere, or the photo when there is one, with a presence dot.
Avatar · AvatarGroup
Sizes
States
Group
Sara Al-QahtaniFahad Al-OtaibiNoura Al-ShehriKhalid Al-DosariReem Al-HarbiAbdullah Al-GhamdiSara Al-QahtaniFahad Al-OtaibiNoura Al-Shehri
Tooltip
A short word on hover or keyboard focus. It even tells why a disabled button is disabled.
Tooltip
With a shortcut
DownloadSearchCtrlK
On a disabled button
Opens once the report is approved
Keys and separator
Key caps (⌘ on Apple devices, Ctrl elsewhere) and a separating line, with or without a word.
Kbd · Separator
Kbd
To search, press CtrlK⇧↵Esc
Separator
or
EditSharePrint
Fields and forms
Every field here is built on the starter's Field: the label above the box, its message under it, one height and one border for every box. Lists and the calendar open over the page and nothing clips them.
Field
The label, the control, and its own message under it. Every field in the library goes through it.
A starter pieceField
States
We only send the sign-in link there.
Enter a valid address, like name@example.org.
Text box
One line, with an icon, a prefix or a suffix, and a character counter when needed.
TextField · Input
States
Empty
Filled
This client already has an open ticket with this title.
Disabled
Read only
Checking
Extras
+966
https://
Accepted
Shown at the top of the report.0 / 40
Sizes
Long text
Grows with the text up to a limit, then scrolls; counts characters when the text has a maximum.
TextAreaField · Textarea
States
Sent to the reviewer with the request.82 / 200
Write the reason so the requester knows what to fix.
Number box
The − and + buttons (hold to keep going), the arrow keys, a minimum and a maximum; digits typed on an Arabic keyboard read as Latin.
NumberField
States
hours
From 0 to 80, in half-hour steps.
The smallest allowed number is 1.
%
Disabled
Search box
A clear button appears as you type, Esc clears, and a keyboard shortcut puts the cursor in it.
SearchField
States
⌘K
Password
The eye shows what was typed. The box runs left to right in both languages.
A starter piecePasswordInput
States
At least twelve characters.
The password is too short.
Disabled
Pick list
Every choice from a list goes through it. A short list opens as it is; a long one (seven options or more) has a search box that understands Arabic spelling.
A starter pieceSearchSelect
States
Short list
Long list with search
Choose the branch's city.
Disabled
Date box
Typed or picked from the calendar. Accepts 25/2/2027 and Arabic digits and turns them into year-month-day.
A starter pieceDateInput
States
This month or the next only.
Enter the whole date.
Date with Hijri
The same date box, with the same day in the Umm al-Qura calendar under it (or beside it), following every pick.
DateField
Layouts
Hijri: 3 Jumada I 1448 AH
Hijri under the box
The Hijri date shows here once a day is picked
Hijri beside it
Both dates together
For a date in a table or a card: Gregorian and Hijri, on one line or two, with the governing calendar emphasised.
DualDate
Display
One line
2026-10-14·3 Jumada I 1448 AH
Two lines
2026-10-143 Jumada I 1448 AH
Hijri governs
2026-10-143 Jumada I 1448 AH
Amounts
The official riyal sign (SAMA), drawn, before the figure in both languages. Digits are always Latin.
Money · RiyalSign
Display
Full
4,850,000
Compact
4.9M
With the code
SAR 1,250
With halalas
312.50
Amount box
Groups the thousands as you type, and turns Arabic digits into Latin ones.
MoneyInput
States
Stored value: nothing yet
The amount is above the support contract’s ceiling.
Disabled
Verification code in boxes
A fixed-length code sent by text or email. Typing moves to the next box, pasting fills them all, Arabic digits read as Latin. Not the same as the two-step sign-in box below.
OtpInput
States
Empty
Complete
The code is wrong or has expired.
Split 3 + 3
Two-step sign-in code
One box that takes an authenticator app code (six digits) or a backup code shaped XXXXX-XXXXX.
A starter pieceCodeInput
States
File upload
Drop or browse; the files are listed under it with their size and a remove button. It draws progress only for a real upload the screen reports.
FileDrop
States
Attach a screenshot of the error.
Checkbox
On or off, and «some» when a group is partly chosen.
Checkbox
States
The starter's own checkbox (for a form posted as is)
Checkbox group
Several options under one label, with «select all».
CheckboxGroup
States
Choose at least one channel.
One of several
A vertical or horizontal list, with a line of explanation per option.
RadioGroup
Layouts
Choose how often the report reaches you.
Choice cards
For a decision where each option needs a sentence.
RadioCards
Switch
For a setting that applies at once, with no save button.
Switch
States
Not changed from here — held by: Faisal Al-Otaibi
The reason in the tooltip (hover, or Tab to it)
«Change request» type — the last one acceptedAt least one type stays acceptedAt least one type stays accepted
Sizes
Segmented buttons
Always one choice among a few, such as how a list is shown.
SegmentedControl
States
Layouts
Filter chips
Several choices switched on and off, with an optional count.
ToggleChips
States
Sizes
Slider
One value or a range, with marks under it and a bubble with the value while dragging.
Slider
States
40%
0%25%50%75%100%
250750
05001,000
Windows and menus
Everything that appears over the page: windows, the side panel, the confirm question, toasts, menus and anchored panels — and with them the page’s quiet states: empty, loading, progressing. Every list and calendar here opens whole above the window that holds it, and Escape closes only the top layer.
Dialog
A window over the page for a short task: a form, details, or a decision. Escape, a click outside or the close button closes it, and focus returns to the button that opened it. On a phone it rises from the bottom edge.
Dialog · DialogClose
Sizes
A form inside a dialog
Side panel
A panel that slides in from the screen’s end (the right in English) for longer things: filters, a record’s details, settings. Same fields; their lists open whole above it.
Sheet
Confirm question
Asks before something that cannot be undone. A click outside does not close it — the answer is yes or no. It can ask for a word to be typed first, and run the work inside itself until it finishes. It opens from anywhere, even from inside an open dialog.
AlertDialog · useConfirm
Tones
Toast
A short word in the screen’s corner about something that happened elsewhere or in the background. It leaves by itself, its timer stops while the pointer is over it, and it shows above any open window.
toast · Toaster
A toast never replaces the result where it lands: a saved form shows its new values, a table dims in place while it refreshes. A toast is for what has no place on this screen: a job finished in the background, an undo for a row that left the list.
Tones
Cases
Dropdown menu
Verbs under a button. It opens under or above it depending on the room, and no table, card or dialog clips it. Arrows move, a first letter jumps, and Escape closes it and returns focus to the button.
DropdownMenu
Every kind of item
This person
Density
«⋯» at a row’s end — the menu grows towards the start
Sara Alotaibi
Khalid Alshammari
Mona Alqahtani
Popover
A small panel under a button: a quick filter, a two-field form, a piece of information. Focus moves into it; a click outside or Escape closes it.
Popover
Quick filter
Applies to the list below it.
Hover card
Shows when the pointer rests on a name or a link, or when the keyboard reaches it, after a short moment. For previews only — no buttons in it.
A note about the whole screen: a refusal, an absence, a standing condition. Not where a field’s error goes — that is written under the field itself.
A starter pieceCallout
This data is a demo and is not saved.
You may not open this screen. Ask your branch manager for access.
Waiting where the result lands
While a result is on its way, the place it will appear says so: the button spins until the new data is really on screen, and the list dims in place instead of being replaced.
A starter piececomponents/Pending
A button and a list sharing one pending state
Row 1
Row 2
Row 3
The list never disappears and keeps its scroll: it only dims until the new row arrives.
A panel with nothing to show yet
Loading…
The spinner on its own
Checking the code…
Empty state
A small drawing, a title, one line of help, and the next step. Four kinds: nothing yet, no results, all done, and failed to load.
EmptyState
Nobody here yet
Add the first person to the branch and the list will appear here.
No results for “senior accountant”
Try a shorter word, or clear the filters.
Nothing is waiting for you
You have reviewed every request. We will tell you when a new one arrives.
Could not load the list
The connection to the server dropped. Nothing was lost.
Small — inside a card or a table
No results for “senior accountant”
Try a shorter word, or clear the filters.
Skeleton
The shape of what is coming, with a calm light crossing it in the reading direction. For a first load only: what is already shown and refreshing stays put and dims.
How far along something measurable is: a file uploading, a wizard’s steps, a share of a target. Digits are always Latin.
Progress · SegmentedProgress · ProgressRing
The bar
Uploading the payroll sheet64%
Approved3 of 5
Storage92%
Nearly full — delete old attachments.
Preparing the file…
Steps
Details
Attachments
Review
Send
Step 2 of 4 · Attachments
The ring
64%
64%
18of 25
Navigation and layout
Moving within a screen and between screens, and laying it out: tabs, steps, the trail, the sidebar and the page header.
Tabs
Switching between parts of the same screen. Arrow keys follow the reading direction, and the marker glides to the open tab.
Tabs
Underlined, with counts
The week in short: seven tasks of nine done, two waiting for approval.
Pill
Enclosed
Name, branch and email.
Vertical
Your photo and name as others see them.
Accordion
Content that opens in place with a smooth height. One section open at a time, or several.
Accordion
Separated, one at a time
Their author, the direct manager, and whoever was given read access in that branch.
One frame, several open
Their author, the direct manager, and whoever was given read access in that branch.
They stay with you and reach nobody until you send them.
Flush
Collapsible and «Show more»
One section that hides what most readers do not need, and long text cut to three lines whose button appears only when the text really is longer.
Collapsible · ShowMore
Collapsible
Submitted from the Riyadh branch; needs two managers to approve.
ShowMore
This is a long text explaining the company's leave policy. Every employee is entitled to thirty days a year, counted from the hiring date, and no more than ten days carry over to the next year. Requests are made at least two weeks ahead and approved by the direct manager, then by human resources. In an emergency a request can be made the same day, with documents attached within three days. Days neither used nor carried over lapse at the end of the year.
A short text that needs no button.
Wizard steps
Where you are in a staged task. Finished steps become buttons to go back, and in a narrow space it folds into «Step 2 of 4».
Stepper
2PeopleCurrent step
3Review(optional)Not started
4SendNot started
2
Step 2 of 4
People
A step that needs attention
DetailsName and branchDone
PeopleNeeds attention
3Review(optional)Current step
4SendNot started
3
Step 3 of 4
Review
In a narrow space
DetailsName and branchDone
2PeopleCurrent step
3Review(optional)Not started
4SendNot started
2
Step 2 of 4
People
Vertical
DetailsName and branchDone
PeopleDone
3Review(optional)Current step
4SendNot started
Breadcrumbs
Where this screen sits. A long trail folds its middle into «…», which opens a menu; in a narrow space it becomes one back link.
Breadcrumbs
Short
Long, the middle folded
In a narrow space
Sidebar
The main navigation column. Its button folds it into an icon rail, and the choice is remembered in the browser for every page. In Arabic it sits on the right.
Sidebar · SidebarGroup · SidebarItem
Open (press «Collapse menu» to try it)
Always collapsed
Page header
The screen title with the section it belongs to, its status chips and its buttons. On a phone the buttons take a full row.
What happened, who did it, and when — grouped by day. Times are always in Latin digits.
Timeline
Today · 19 October 2026
Sara Al-Qahtani approved the report
Fahad Al-Otaibi added a note
The figures on page three need a check before approval.
Activity
Yesterday · 18 October 2026
The report was returned for changes
16 October 2026
Noura Al-Shehri created the report
Compact
Sara Al-Qahtani approved the report
Fahad Al-Otaibi added a note
The figures on page three need a check before approval.
Activity
The report was returned for changes
Card
A header and a body, nothing else. This is the starter's own card, drawn in the library's colours in light and dark.
A starter pieceCard
Branch details
Everything in a card sits in its body, so nothing touches its edge.
Labelled value
The shape every figure and date is drawn in: the label, then the value — isolated, so a date never flips inside Arabic text.
A starter pieceFigure
Opened on
2019-03-14
Staff
1,284
Annual support contract
482,500.00
Phone
+966 11 465 0000
Figures and charts
The figures that matter, in a tile, and the charts that explain them. Their colours come from the chart slots in the brand block, their digits are Latin, and under Arabic time runs from the right.
Stat card
A label, a figure, the change against the last period, and a small trend. The change is coloured by whether it is good news, not by its sign: fewer failed sign-ins is green.