Original reportPerformance issue · Impact Moderate · Urgency High
Between 7:30 and 9:00 am pages take over 20 seconds to load at the Khobar and Dammam branches. After 9 it goes back to normal. This has been happening for about a week.
Duroob LogisticsDuroob hostingopened 52 days ago
Original reportPerformance issue · Impact Moderate · Urgency High
Between 7:30 and 9:00 am pages take over 20 seconds to load at the Khobar and Dammam branches. After 9 it goes back to normal. This has been happening for about a week.
Thanks for the detail. We’ll review server and database load during that window and get back to you with what we find.
Nightly backup job is scheduled at 04:00 UTC = 7:00 Riyadh and runs for two hours, colliding with the heavy dashboard queries. Moved the cron to 23:00 UTC.
Is the slowness on every screen or a specific one? Roughly how many users are on the system at that time?
DTM-2026-0322 — It’s worst on the “Sales Dashboard” and the daily reports. About 60 staff log in at the start of the shift.
Configuration error: Moved the nightly backup to 2:00 am Riyadh time, as it was overlapping the start of the working day. Page loads are back under 3 seconds.
Only Infrastructure & Hosting team members and administrators see it. It never enters the message log.