Demo clockDark mode

System very slow in the mornings

RS4-2026-0227ClosedMediumMet the SLASupport team

Al-Jazira Plastics FactoryAl-Jazira Plastics hostingopened 14 days ago

  1. 6 November 2026
    1. JP
      Eng. Fahad Al-BuainainAl-Jazira Plastics FactoryPortal2026-11-06 12:55

      Original reportPerformance issue · Impact Moderate · Urgency High

      Between ⁦7:30⁩ and ⁦9:00⁩ am pages take over ⁦20⁩ seconds to load at the Khobar and Dammam branches. After ⁦9⁩ it goes back to normal. This has been happening for about a week.

    2. Ticket created from Support team.2026-11-06 12:55
    3. Assigned to Munira Al-Sahli.2026-11-06 13:32
    4. MS
      2026-11-06 15:19Support agentMunira Al-Sahli

      Thanks for the detail. We’ll review server and database load during that window and get back to you with what we find.

      SampleFrom the demo’s sample history — never actually sent to any number.Eng. Fahad Al-Buainain

      Skipped — the client turned this kind off

  2. 7 November 2026
    1. MS
      2026-11-07 04:54Support agentMunira Al-Sahli

      Configuration error: Moved the nightly backup to ⁦2:00⁩ am Riyadh time, as it was overlapping the start of the working day. Page loads are back under ⁦3⁩ seconds.

      SampleFrom the demo’s sample history — never actually sent to any number.Approved template: Resolution doneEng. Fahad Al-Buainain
Stays inside the platform — never sent, never shown to the client

Only Infrastructure & Hosting team members and administrators see it. It never enters the message log.