Demo clockDark mode

Receivables ageing report takes too long

RS4-2026-0229ClosedMediumMet the SLAPortal

Al-Jazira Plastics FactoryMawared — Al-Jazira Plasticsopened 11 days ago

  1. 10 November 2026
    1. JP
      Eng. Fahad Al-BuainainAl-Jazira Plastics FactoryPortal2026-11-10 10:04

      Original reportPerformance issue · Impact Moderate · Urgency High

      The “Receivables ageing” report takes more than ⁦4⁩ minutes and sometimes fails, and collections uses it every day. We have about ⁦2,300⁩ active customers.

    2. Ticket created from Portal.2026-11-10 10:04
    3. Assigned to Yousef Al-Shammari.2026-11-10 11:13
    4. YS
      2026-11-10 12:09Support agentYousef Al-Shammari

      Thanks for reporting it. We’re analysing the report’s performance and will get back to you.

      SampleFrom the demo’s sample history — never actually sent to any number.Eng. Fahad Al-Buainain

      Skipped — the client turned this kind off

    5. Internal noteYSYousef Al-ShammariNever sent, never shown to the client2026-11-10 12:58

      Report recomputes balances from every transaction since ⁦2019⁩. Added a nightly-refreshed monthly balance snapshot (materialized) — ⁦4:10⁩ min down to ⁦6⁩ s.

    6. YS
      2026-11-10 13:08Information request · clock pausedSupport agentYousef Al-Shammari

      Do you run it for all branches at once or per branch?

      SampleFrom the demo’s sample history — never actually sent to any number.Approved template: Update outside the windowEng. Fahad Al-Buainain
    7. JP
      Eng. Fahad Al-BuainainAl-Jazira Plastics FactoryPortal2026-11-10 14:11

      All branches, as of today.

    8. The client replied; the ticket is back «In progress» and the clock resumed.2026-11-10 14:11
  2. 11 November 2026
    1. YS
      2026-11-11 04:38Support agentYousef Al-Shammari

      Software bug fixed: Improved the receivables ageing report using pre-computed monthly balances; it now runs in ⁦6⁩ seconds instead of ⁦4⁩ minutes.

      SampleFrom the demo’s sample history — never actually sent to any number.Eng. Fahad Al-Buainain
Stays inside the platform — never sent, never shown to the client

Only Enterprise Systems team members and administrators see it. It never enters the message log.