Demo clockDark mode

Same slot booked twice

RS4-2026-0230ClosedHighMet the SLAWhatsApp

Basma Dental ClinicsMawid — Basma Dentalopened 10 days ago

  1. 10 November 2026
    1. BD
      Dr. Rayan Al-QarniBasma Dental ClinicsWhatsApp2026-11-10 17:15

      Original reportIncident · Impact Moderate · Urgency Urgent

      Three times this morning the same dental slot at our Al-Malqa branch was booked for two patients — one through the app and one at reception. It’s been very embarrassing with patients.

    2. Ticket created from WhatsApp.2026-11-10 17:15
    3. Taken by Sultan Al-Mutairi.2026-11-10 17:25
    4. SM
      2026-11-10 17:44Support agentSultan Al-Mutairi

      Sorry for the trouble. We’re reviewing the booking log for those three slots to find the cause right away.

      SampleFrom the demo’s sample history — never actually sent to any number.Approved template: Update outside the windowBasma — systems7 recipients
    5. Internal noteSMSultan Al-MutairiNever sent, never shown to the client2026-11-10 18:50

      Race between two requests within a second: availability check then insert with no lock. Added a unique constraint on (doctor_id, slot_start) plus SELECT FOR UPDATE — Faisal load-tested it with ⁦50⁩ concurrent requests.

    6. SM
      2026-11-10 20:24Support agentSultan Al-Mutairi

      Software bug fixed: Fixed the fault that let two channels book the same slot at the same moment; the system now rejects the second booking and suggests the next free slot.

      SampleFrom the demo’s sample history — never actually sent to any number.Approved template: Resolution doneBasma — systems7 recipients
Stays inside the platform — never sent, never shown to the client

Only Web & Portals team members and administrators see it. It never enters the message log.