Demo clockDark mode

System very slow in the mornings

RS4-2026-0233ClosedHighMissed the SLAPortal

Al-Jazira Plastics FactoryAl-Jazira Plastics hostingopened 9 days ago

  1. 12 November 2026
    1. JP
      Eng. Fahad Al-BuainainAl-Jazira Plastics FactoryPortal2026-11-12 10:14

      Original reportPerformance issue · Impact Moderate · Urgency High

      Between ⁦7:30⁩ and ⁦9:00⁩ am pages take over ⁦20⁩ seconds to load at the Khobar and Dammam branches. After ⁦9⁩ it goes back to normal. This has been happening for about a week.

    2. Ticket created from Portal.2026-11-12 10:14
    3. Assigned to Turki Al-Anazi.2026-11-12 12:23
    4. TA
      2026-11-12 12:40Support agentTurki Al-Anazi

      Thanks for the detail. We’ll review server and database load during that window and get back to you with what we find.

      SampleFrom the demo’s sample history — never actually sent to any number.Eng. Fahad Al-Buainain

      Skipped — the client turned this kind off

    5. Internal noteTATurki Al-AnaziNever sent, never shown to the client2026-11-12 13:31

      Nightly backup job is scheduled at ⁦04:00⁩ UTC = ⁦7:00⁩ Riyadh and runs for two hours, colliding with the heavy dashboard queries. Moved the cron to ⁦23:00⁩ UTC.

    6. TA
      2026-11-12 13:41Information request · clock pausedSupport agentTurki Al-Anazi

      Is the slowness on every screen or a specific one? Roughly how many users are on the system at that time?

      SampleFrom the demo’s sample history — never actually sent to any number.Approved template: Update outside the windowEng. Fahad Al-Buainain
    7. JP
      Eng. Fahad Al-BuainainAl-Jazira Plastics FactoryWhatsApp2026-11-12 16:21

      ⁦RS4-2026-0233⁩ — It’s worst on the “Sales Dashboard” and the daily reports. About ⁦60⁩ staff log in at the start of the shift.

    8. The client replied; the ticket is back «In progress» and the clock resumed.2026-11-12 16:21
  2. 13 November 2026
    1. TA
      2026-11-13 06:11Support agentTurki Al-Anazi

      Configuration error: Moved the nightly backup to ⁦2:00⁩ am Riyadh time, as it was overlapping the start of the working day. Page loads are back under ⁦3⁩ seconds.

      SampleFrom the demo’s sample history — never actually sent to any number.Eng. Fahad Al-Buainain
Stays inside the platform — never sent, never shown to the client

Only Infrastructure & Hosting team members and administrators see it. It never enters the message log.